Westwood Ctr

Westwood Center Office Park

phase three is a professional office building consisting of 101,720 square feet of office space and a 684 space garage structure.

In order to accomplish the challenging task, existing zoning approvals were modified to allow the density increase. The existing parking area and the master stormwater pond had to be significantly modified to accommodate the proposed improvements without allowing any adverse impacts to the tenants occupying the existing 111,000 square feet of office space at the site. The design included site design, paving, grading, drainage, stormwater management, wastewater collection, drinking water distribution and fire protection systems. In addition to obtaining the required zoning approvals and modifications, construction permits were obtained from Orange County, South Florida Water Management District, Valencia Water Control and FDEP. Substantial construction administration and inspection services were also provided.

More in this category: Baltasar »
Home Engineering Portfolio Professional Offices Westwood Ctr

Find Us

1

1916 N. Park Avenue Winter Park FL 32789

Tel: (407) 488-5028, Mail: bob@pe-grp.com