Belle Terre

In Roads

This Flagler County project involved the widening of Use Belle Terre Parkway

The 45 mph design is 2 miles long, and consists of a rural section with median. The contract included design of paving, grading, drainage, striping and pavement marking, pedestrian facilities and signalization. The stormwater management system was also designed to incorporate the needs of a future public library project. Coordination with local Utilities providers was provided to relocate existing utilities. Construction permits were obtained from Flagler County and the St. Johns River Water Management District.

More in this category: « Cypress Point
Home Engineering Portfolio Roads Belle Terre

Find Us

1

1916 N. Park Avenue Winter Park FL 32789

Tel: (407) 488-5028, Mail: bob@pe-grp.com